We answer for every site we open.

We answer for every site we open. Licensing, rehabilitation and site safety are not compliance items for us — they are the job itself.

Summary

Our approach in four areas.

Site rehabilitation

Mining intervenes in nature. On benches where production is complete, bench reshaping and replanting are carried out as an integral part of the licensing process.

Dust and water management

Dust suppression systems run on the crushing-screening lines and haul roads; water used in the washing plant is settled in sedimentation ponds.

Health & safety

Blasting, crushing and haulage are the three highest-risk steps in mining. Defined rules, equipment checks and on-site speed limits apply from the gate to dispatch.

Regional contribution

Most of our output stays in the region: ready-mix production at our group company Bodrum Beton, and the road, infrastructure and building projects of Milas and Bodrum. Our workforce is local too.

Site rehabilitation

Site rehabilitation

Mining intervenes in nature, and the responsibility is correspondingly large. On benches where production is complete, bench reshaping, topsoil spreading and planting are carried out.

Rehabilitation does not wait for the whole site to be finished: as production advances, the benches left behind are dealt with in turn. This reduces both the visual impact and the risk of erosion.

Dust and water management

Dust and water management

Dust suppression systems run on the crushing-screening lines and haul roads, and wind measures are in place at the stockpile areas. Dust is not only an environmental matter but an occupational health one.

Water used in the aggregate washing plant is settled in sedimentation ponds; once the solids are separated out, the water is returned to the cycle.

Health & safety

Health & safety

Blasting, crushing and haulage — the three highest-risk steps in mining. Defined rules, equipment checks and on-site speed limits apply from the gate to dispatch.

Visitor and supplier vehicles are subject to the same rules: no entry to the production area without a hard hat, hi-vis vest and site escort.

Regional contribution

Regional contribution

Most of our output stays in the region: ready-mix production at our group company Bodrum Beton, and the road, infrastructure and building projects of Milas and Bodrum.

Our workforce is local too. Most of our quarry, plant and haulage crews come from Milas and the surrounding settlements.

Contact

Let’s set up an aggregate supply programme for your project.

Tell us the fraction, tonnage and delivery schedule you need, and we will work out the dispatch plan together.

Request a quote +90 252 559 0 112
Ozan Global Holding
An Ozan Global Holding companyA multi-sector industrial group producing in concrete, pipes, mining, marine services and food. İTS Maden, founded in 1994, is the group’s first company.